BYOW™ · POWERED BY HEART WATER

Data centers that bring their own water.

Data centers are already asked to bring their own power. Water is next. Heart Water engineers on-site water supply into the campus, so it doesn't compete with the town for a single gallon.

START A CONVERSATION Under NDA from the first conversation.
THE SHIFT

First power. Now water.

Communities are asking a new question at every hearing: where will the cooling water come from? A site with its own answer moves forward. A site without one waits.

7 in 101

Americans oppose a new data center in their area.

$98B2

in data center projects delayed or blocked by local opposition in a single quarter.

2–4×3

projected growth in U.S. data center direct water use, 2023–2028.

WHAT BYOW MEANS

On-site first. Municipal as backup, not baseline.

01 CAPTURE

The campus's own roofs and hardstand become its catchment.

02 STORE

Storage fits into land the site plan has already set aside.

03 SUPPLY

Water reaches the cooling loop, metered at the point of use.

04 RETURN

Less draw on the town's supply, and less runoff leaving the site.

Rain is intermittent. Your supply isn't.

Captured water carries a designed share of cooling demand, with existing supply behind it, so a dry month is a normal month and a curtailment isn't a crisis.

WHY IT MATTERS

Water on the continuity ledger, like backup power.

Site approval

Walk into the hearing with the water question already answered.

Continuity

Supply that isn't exposed to curtailment, allocation caps or moratoria.

Speed

Designed in from pre-feasibility, alongside your EPC, so water never holds up the schedule.

3 ISSUED U.S. PATENTS 7+ YEARS OPERATING A LICENSED PUBLIC WATER SYSTEM HYPERSCALE ENGAGEMENTS UNDERWAY

Water gets decided before the site plan locks.

Bring us in early and storage fits into land you've already set aside. Bring us in late and it costs you a building pad.

START A CONVERSATION

Under NDA from the first conversation. Your site data stays yours.